Assign each work order to the right work centre and the right shift, without spending the morning on a spreadsheet.
02
Account for real-world disruptions: closures, weekend openings, raw material shortages.
03
Try out a schedule before applying it, and compare it with the previous version.
02 Our approach

Constraint-based optimisation
An engine that respects work centre capacity, closures, exceptional weekend openings and material availability.

Drag and drop, explained
Available at any time. When a placement is rejected, the screen tells you why: insufficient capacity, shift not working, material unavailable, order locked.

Grouping by semi-finished product
Similar orders are grouped behind the same semi-finished product, within a time window you choose.

Locking
Whatever you lock stays put: a new optimisation run never moves a frozen order.
03 Results

A schedule in seconds
Complete, work centre by work centre and shift by shift.

5 key figures at the top of the screen
On time, late, cumulative delay, material shortage, unscheduled.

Test before you apply
A schedule you can try out, save, reload and compare.

Customisation
01
Work centres
Your work centres and their throughput rates, added in seconds: a new work centre appears immediately in the grid and in the calculation.
02
Real calendar
Your actual calendar: closures, slowdowns and the weekends you open exceptionally.
03
Safety lead time
The buffer you set aside before each need date, by product type. It decides what shows as on time or late.
04
Engine priorities
What the engine favours when it has to choose: volume, urgency or run continuity.
05
Grouping window
The time window within which similar orders are grouped, to reduce changeovers.